Nuclear Power

You are here:
< All Topics
Build Cost:$10,000,000
Wages Cost:$2,400
Build Requirements:5 Steel, 5 Iron, 5 Energy, Must place near Paved Road and Water Pump
Produces:Energy
Timer:20-160 Seconds
Affected by:none
Shade/Windblock:3 tiles
Pollution:none
Proximity Effect: Provides 4/3/2/1 passive energy to surrounding buildings.

Previous Energy
Table of Contents