Paved Road
Build Cost: | $10,000 |
Wages Cost: | none |
Build Requirements: | 3 Wood, Must place near Road |
Produces: | none |
Timer: | none |
Affected by: | none |
Shade/Windblock: | none |
Shade/Windblock: | none |
Makes workers run even faster than on the dirt road.
Build Cost: | $10,000 |
Wages Cost: | none |
Build Requirements: | 3 Wood, Must place near Road |
Produces: | none |
Timer: | none |
Affected by: | none |
Shade/Windblock: | none |
Shade/Windblock: | none |